Oakland Avenue/San Carlos Avenue Retaining Wall
The work in general consists of replacement of concrete retaining walls, storm drain piping, asphaltic concrete pavement, minor concrete, curb ramp and sidewalk, signage, and such other items of work as are required to complete the project.
Addendum 1
(click to expand/collapse)

Name | Size | |||
PIED_Oak Ave San Carlos Ave RWall_Addendum1 | 1.1 MB |
Addendum 2
(click to expand/collapse)

Name | Size | |||
Addendum 2 Questions_Bid Sheet Final | 295.4 KB |