2021 Paving Project

The work in general consists of asphaltic concrete pavement, minor concrete, curb ramp and sidewalk and driveway reconstruction, striping and pavement markings, signage, enhanced crosswalk lit signage, electrical, and such other items of work as are required to complete the project.
Plans (click to expand/collapse)
Name Size
CCE_134519 45.2 MB